SUBPART G—Closure (§267.110 to §267.117)
- 267.110—Does this subpart apply to me?
- 267.111—What general standards must I meet when I stop operating the unit?
- 267.112—What procedures must I follow?
- 267.113—Will the public have the opportunity to comment on the plan?
- 267.115—After I stop operating, how long until I must close?
- 267.116—What must I do with contaminated equipment, structure, and soils?
- 267.117—How do I certify closure?