264.1052—Standards: Pumps in light liquid service.
(a)
(1)
Each pump in light liquid service shall be monitored monthly to detect leaks by the methods specified in § 264.1063(b), except as provided in paragraphs (d), (e), and (f) of this section.
(2)
Each pump in light liquid service shall be checked by visual inspection each calendar week for indications of liquids dripping from the pump seal.
(c)
(1)
When a leak is detected, it shall be repaired as soon as practicable, but not later than 15 calendar days after it is detected, except as provided in § 264.1059.
(2)
A first attempt at repair (e.g., tightening the packing gland) shall be made no later than 5 calendar days after each leak is detected.
(d)
Each pump equipped with a dual mechanical seal system that includes a barrier fluid system is exempt from the requirements of paragraph (a) of this section, provided the following requirements are met:
(i)
Operated with the barrier fluid at a pressure that is at all times greater than the pump stuffing box pressure, or
(ii)
Equipped with a barrier fluid degassing reservoir that is connected by a closed-vent system to a control device that complies with the requirements of § 264.1060, or
(iii)
Equipped with a system that purges the barrier fluid into a hazardous waste stream with no detectable emissions to the atmosphere.
(2)
The barrier fluid system must not be a hazardous waste with organic concentrations 10 percent or greater by weight.
(3)
Each barrier fluid system must be equipped with a sensor that will detect failure of the seal system, the barrier fluid system, or both.
(4)
Each pump must be checked by visual inspection, each calendar week, for indications of liquids dripping from the pump seals.
(5)
(i)
Each sensor as described in paragraph (d)(3) of this section must be checked daily or be equipped with an audible alarm that must be checked monthly to ensure that it is functioning properly.
(ii)
The owner or operator must determine, based on design considerations and operating experience, a criterion that indicates failure of the seal system, the barrier fluid system, or both.
(6)
(i)
If there are indications of liquids dripping from the pump seal or the sensor indicates failure of the seal system, the barrier fluid system, or both based on the criterion determined in paragraph (d)(5)(ii) of this section, a leak is detected.
(ii)
When a leak is detected, it shall be repaired as soon as practicable, but not later than 15 calendar days after it is detected, except as provided in § 264.1059.
(iii)
A first attempt at repair (e.g., relapping the seal) shall be made no later than 5 calendar days after each leak is detected.
(e)
Any pump that is designated, as described in § 264.1064(g)(2), for no detectable emissions, as indicated by an instrument reading of less than 500 ppm above background, is exempt from the requirements of paragraphs (a), (c), and (d) of this section if the pump meets the following requirements:
(2)
Must operate with no detectable emissions as indicated by an instrument reading of less than 500 ppm above background as measured by the methods specified in § 264.1063(c).
(3)
Must be tested for compliance with paragraph (e)(2) of this section initially upon designation, annually, and at other times as requested by the Regional Administrator.
(f)
If any pump is equipped with a closed-vent system capable of capturing and transporting any leakage from the seal or seals to a control device that complies with the requirements of § 264.1060, it is exempt from the requirements of paragraphs (a) through (e) of this section.