240.210-3—Recommended procedures: Operations.
(a)
The facility supervisor should be experienced in the operation of the type of facility designed or, in the case of an innovated design, be adequately trained by responsible personnel in the operation of the facility.
(b)
Alternate and standby disposal and operating procedures should be established for implementation during emergencies, air pollution episodes, and shutdown periods.
(c)
Upon completion of facility construction, provision should be made for instruction of the staff in proper operation and maintenance procedures.
(e)
As-built engineering drawings of the facility should be provided at the conclusion of construction of the facility. These should be updated to show modifications by the owner as changes are made and should be readily available. A schematic showing the relationships of the various subsystems should also be available.
(g)
Equipment manuals, catalogs, spare parts lists, and spare parts should be readily available at the facility.