39.81—Preapplication requirements .

(a) A State seeking a grant for the operation or maintenance of a State veterans cemetery must submit a preapplication to the Director, State Cemetery Grants Service, through http://www.cem.va.gov/cem/scg_grants.asp.
(b) No detailed drawings, plans, or specifications are required with the preapplication. As a part of the preapplication, the State must submit each of the following:
(1) Standard Form 424 (Application for Federal Assistance) and Standard Form 424C (Budget Information) signed by the authorized representative of the State. These forms document the amount of the grant requested, which may not exceed 100 percent of the estimated cost of the project to be funded with the grant.
(2) VA Form 40-0895-2 (Certification of Compliance with Provisions of the Davis-Bacon Act) to certify that the State has obtained the latest prevailing wage rates for Federally funded projects. Any construction project fully or partially funded with Federal dollars must comply with those rates for specific work by trade employees (e.g., electricians, carpenters).
(3) VA Form 40-0895-6 (Certification of State or Tribal Government Matching Architectural and Engineering Funds to Qualify for Group 1 on the Priority List) to provide documentation that the State has legislative authority to support the project and the resources necessary to initially fund the architectural and engineering portion of the project development. Once the grant is awarded, VA will reimburse the applicant for all allowable architectural and engineering costs.
(4) VA Form 40-0895-7 (Certification Regarding Debarment, Suspension, and Other Responsibility Matters-Primary Covered Transactions (State or Tribal Government)) to ensure that the applicant has not been debarred or suspended, and is eligible to participate in the VA grant process and receive Federal funds.
(5) VA Form 40-0895-8 (Certification Regarding Drug-Free Workplace Requirements for Grantees Other Than Individuals) to ensure that the applicant complies with the Drug-Free Workplace Act of 1988 at the location where the construction will occur.
(6) VA Form 40-0895-9 (Certification Regarding Lobbying) to ensure that the applicant complies with Public Law 101-121 regarding the prohibition against any payments to anyone that influences or attempts to influence an officer or Member of Congress in connection with the award of a grant.
(7) VA Form 40-0895-10 (Certification of Compliance with Federal Requirements-State or Tribal Government Construction Grant) to ensure that the applicant complies with all requirements of part 39.
(8) VA Form 40-0895-15 (Certification of Cemetery Maintained in Accordance with National Cemetery Administration Standards) to ensure that any cemetery operated or maintained through a grant will be operated and maintained in accordance with VA's national shrine standards of appearance.
(9) A gravesite assessment survey documenting the State cemetery's performance related to the standards outlined in paragraph (b)(10) of this section for the year in which the preapplication is submitted.
(10) A program narrative describing how the project will assist the State in meeting VA's national shrine standards with respect to cleanliness, height and alignment of headstones and markers, leveling of gravesites, or turf conditions. Specifically, the preapplication should explain the need for the grant, how the work is to be accomplished, and the expected improvement in the State cemetery's performance related to one or more of the following national shrine standards:
(i) Cleanliness. 90 percent of headstones, markers, and niche covers must be clean and free of debris and objectionable accumulations.
(ii) Height. 90 percent of headstones and markers must be set and maintained at the proper height.
(iii) Alignment. 100 percent of headstones, markers, and niche covers must be properly installed. Upright headstones in active burial sections must be uniform in height (24″-26″ above ground), horizontally and vertically aligned with inscriptions visible, and installed to ensure a pleasing top line while compensating for ground contours. Flat markers must be uniform in height (parallel with the ground and no more than 1″ above grade) and horizontally and vertically aligned. Niche covers must be horizontally and vertically aligned. All inscriptions must be visible.
(iv) Grade. 95 percent of the grade of every gravesite must blend in with adjacent grade levels.
(v) Turf conditions. 100 percent of visually prominent areas must have a well-established, healthy stand of turf that is generally weed free; 95 percent of visually prominent areas with established turf must be generally free of bare areas.
(11) A description of the geographic location of the existing State cemetery and any other supporting documentation, as requested by the SCGS Director.
(12) A description of the project including the number and types of headstones and markers that need to be cleaned and aligned, a description of the gravesites that need to be leveled, and a description of the turf conditions that need to be improved to meet VA's national shrine standards.
(c) In addition, the State must submit written assurance of each of the following conditions:
(1) Any cemetery in receipt of a grant under this subpart will be used exclusively for the interment or memorialization of eligible persons, as set forth in § 39.10(a), whose interment or memorialization is not contrary to the conditions of the grant (see § 39.10(b) and U.S.C. 2408(d) and 2411).
(2) Title to the site is or will be vested solely in the State.
(3) The State possesses legal authority to apply for the grant.
(4) The State will obtain approval by VA of the final specifications before the project is advertised or placed on the market for bidding; the project will achieve VA's national shrine standards with respect to cleanliness, height and alignment of headstones and markers, leveling of gravesites, or turf conditions in accordance with the application and approved plans and specifications; the State will submit to the Director of the State Cemetery Grants Service, for prior approval, changes that alter any cost of the project; and the State will not enter into a contract for the project or undertake other activities until all the requirements of the grant program have been met.
(d) Depending on the scope of the project, the SCGS will work with the State to determine which, if any, of the following are required:
(1) Compliance with section 106 of the National Historic Preservation Act of 1966, as amended (16 U.S.C. 470 ), Executive Order 11593 (identification and protection of historic properties), and the Archaeological and Historic Preservation Act of 1974 (16 U.S.C. 469a-1 et seq. ).
(2) Compliance with the Federal requirements in 2 CFR parts 180 and 801 and 38 CFR part 43 and submission of Standard Form 424D (Assurances—Construction Programs).
(3) A site Environmental Assessment to determine whether an Environmental Impact Statement will be necessary as a result of the work to be performed on the headstones and markers, gravesites, or turf conditions.
(e) Upon receipt of a complete preapplication for a grant, including all necessary assurances and all required supporting documentation, VA will determine whether the preapplication conforms to all requirements listed in paragraphs (a) through (d) of this section, including whether it contains sufficient information necessary to establish the project's priority. VA will notify the State of any nonconformity. If the preapplication does conform, VA shall notify the State that the preapplication has been found to meet the preapplication requirements, and the proposed project will be included in the next scheduled ranking of projects, as indicated in § 39.3(d).

Code of Federal Regulations

(Authority: 38 U.S.C. 501, 2408, 2411 )
(The Office of Management and Budget has approved the information collection requirements in this section under control numbers 4040-0004, 4040-0008, 4040-0009, and 2900-0559)