155.1130—Requirements for prepositioned response equipment.
The owner or operator of a tanker subject to this subpart shall provide the following prepositioned response equipment, located within Prince William Sound, in addition to that required by § 155.1035 :
(a)
On-water recovery equipment with a minimum effective daily recovery capacity of 30,000 barrels, capable of being on scene within 6 hours of notification of a discharge.
(b)
On-water storage capacity of 100,000 barrels, capable of being on scene within 6 hours of notification of a discharge.
(c)
Additional on-water recovery equipment with a minimum effective daily recovery capacity of 40,000 barrels capable of being on scene within 18 hours of notification of a discharge.
(d)
On-water storage capacity of 300,000 barrels for recovered oily material, capable of being on scene within 24 hours of notification of a discharge.
(e)
On-water oil recovery devices and storage equipment located in communities and at strategic locations.
(f)
For sufficient protection of the environment in the locations identified in § 155.1125(a)(1)(ii) —
(12)
Other appropriate removal equipment for the protection of the environment as identified by the COTP.
(g)
For each oil-laden tanker, an escorting response vessel which is fitted with skimming and on board storage capabilities practicable for the initial oil recovery planned for a cleanup operation, as identified by the oil spill removal organization.
(h)
Lightering resources required in subpart I of this part capable of arriving on scene within 6 hours of notification of a discharge.