127.315—Preliminary transfer inspection.
Before transferring LNG, the person in charge of shoreside transfer operations shall—
(a)
Inspect the transfer piping and equipment to be used during the transfer and replace any worn or inoperable parts;
(b)
For each of the vessel's cargo tanks from which cargo will be transferred, note the pressure, temperature, and volume to ensure they are safe for transfer;
(d)
Ensure that transfer connections allow the vessel to move to the limits of its moorings without placing strain on the loading arm or transfer piping system;
(e)
Ensure that each part of the transfer system is aligned to allow the flow of LNG to the desired location;