117.511—West Pearl River.
(a)
The draw of the Norfolk Southern railroad bridge, mile 22.1 at Pearl River Station, shall open on signal if at least six hours notice is given.
(b)
The draw of the US 90 bridge, mile 7.9 near Pearlington, shall open on signal if at least four hours notice is given.