PART 785—REQUIREMENTS FOR PERMITS FOR SPECIAL CATEGORIES OF MINING
- 785.1—Scope.
- 785.2—Objective.
- 785.10—Information collection.
- 785.11—Anthracite surface coal mining and reclamation operations.
- 785.12—Special bituminous surface coal mining and reclamation operations.
- 785.13—Experimental practices mining.
- 785.14—Mountaintop removal mining.
- 785.15—Steep slope mining.
- 785.16—Permits incorporating variances from approximate original contour restoration requirements for steep slope mining.
- 785.17—Prime farmland.
- 785.18—Variances for delay in contemporaneous reclamation requirement in combined surface and underground mining activities.
- 785.19—Surface coal mining and reclamation operations on areas or adjacent to areas including alluvial valley floors in the arid and semiarid areas west of the 100th meridian.
- 785.20—Augering.
- 785.21—Coal preparation plants not located within the permit area of a mine.
- 785.22—In situ processing activities.
- 785.25—Lands eligible for remining.