57.6401—Shunting.
Except during testing—
(a)
Electric detonators shall be kept shunted until connected to the blasting line or wired into a blasting round;
(b)
Wired rounds shall be kept shunted until connected to the blasting line; and
(c)
Blasting lines shall be kept shunted until immediately before blasting.