SUBPART B—Ground Control (§56.3000 to §56.3430)
- 56.3000—Definitions.
- 56.3130—Wall, bank, and slope stability.
- 56.3131—Pit or quarry wall perimeter.
- 56.3200—Correction of hazardous conditions.
- 56.3201—Location for performing scaling.
- 56.3202—Scaling tools.
- 56.3203—Rock fixtures.
- 56.3400—Secondary breakage.
- 56.3401—Examination of ground conditions.
- 56.3430—Activity between machinery or equipment and the highwall or bank.