285.815—What must I do if I have facility damage or an equipment failure?
(a)
If you have facility damage or the failure of a pipeline, cable, or other equipment necessary for you to implement your approved plan, you must make repairs as soon as practicable. If you have a major repair, you must submit a report of the repairs to MMS, as required in § 285.711.
(b)
If you are required to report any facility damage or failure under § 285.831, MMS may require you to revise your SAP, COP, or GAP to describe how you will address the facility damage or failure as required by § 285.634 (COP), § 285.617 (SAP), § 285.655 (GAP). You must submit a report of the repairs to MMS, as required in § 285.703.
(c)
The MMS may require that you analyze cable, pipeline, or facility damage or failure to determine the cause. If requested by MMS, you must submit a comprehensive written report of the failure or damage to MMS as soon as available.