250.444—What are the choke manifold requirements?
(a)
Your BOP system must include a choke manifold that is suitable for the anticipated surface pressures, anticipated methods of well control, the surrounding environment, and the corrosiveness, volume, and abrasiveness of drilling fluids and well fluids that you may encounter.
(b)
Choke manifold components must have a rated working pressure at least as great as the rated working pressure of the ram BOPs. If your choke manifold has buffer tanks downstream of choke assemblies, you must install isolation valves on any bleed lines.
(c)
Valves, pipes, flexible steel hoses, and other fittings upstream of the choke manifold must have a rated working pressure at least as great as the rated working pressure of the ram BOPs.