SUBPART B—Selection Procedures, Award Criteria (§636.201 to §636.212)
- 636.201—What selection procedures and award criteria may be used?
- 636.202—When are two-phase design-build selection procedures appropriate?
- 636.203—What are the elements of two-phase selection procedures for competitive proposals?
- 636.204—What items may be included in a phase-one solicitation?
- 636.205—Can past performance be used as an evaluation criteria?
- 636.206—How do I evaluate offerors who do not have a record of relevant past performance?
- 636.207—Is there a limit on short listed firms?
- 636.208—May I use my existing prequalification procedures with design-build contracts?
- 636.209—What items must be included in a phase-two solicitation?
- 636.210—What requirements apply to projects which use the modified design-build procedure?
- 636.211—When and how should tradeoffs be used?
- 636.212—To what extent must tradeoff decisions be documented?