115.28—Application for approval.
Each application by a manufacturer or an owner for certification of a container by design type must include:
(a)
Three copies, each no larger than 3 feet by 4 feet, of the customs and TIR/Container plan;
(b)
Customs and TIR/Container plan number;
(c)
Three copies of the specifications which include the following information:
(1)
The name and address of the manufacturer and the owner; and
(2)
A description of the container including the—
(i)
Type of construction;
(iii)
Material of construction;
(iv)
Coating system used;
(v)
Identification marks and numbers; and
(d)
The location and date for inspection; and
(e)
A statement signed by the manufacturer that:
(1)
A container of the design type concerned is available for inspection and approval by the Certifying Authority before, during, and after the production run;
(2)
Notification will be given to the Certifying Authority of each change in the design before adoption; and
(3)
Each container will be marked with:
(i)
The metal plate required in § 115.32 ;
(ii)
The identification number or letter of the design type assigned by the manufacturer; and
(iii)
The serial number of the container assigned by the manufacturer.