39.11—Reliability reports.
(a)
The Electric Reliability Organization shall conduct assessments as determined by the Commission of the reliability of the Bulk-Power System in North America and provide a report to the Commission and provide subsequent reports of the same to the Commission.
(b)
The Electric Reliability Organization shall conduct assessments of the adequacy of the Bulk-Power System in North America and report its findings to the Commission, the Secretary of Energy, each Regional Entity, and each Regional Advisory Body annually or more frequently if so ordered by the Commission.