1304.403—Marina sewage pump-out stations and holding tanks.
All pump-out facilities constructed after September 8, 2003 shall meet the following minimum design and operating requirements:
(b)
Suction controls or vacuum breaker capable of limiting suction to such levels as will avoid collapse of rigid holding tanks;
(d)
Check valve and positive cut-off or other device to preclude spillage when breaking connection with vessel being severed;
(e)
Adequate interim storage where storage is necessary before transfer to approved treatment facilities;
(i)
Spill-proof features adequate for transfer of sewage from all movable floating pump-out facilities to shore-based treatment plants or intermediate transfer facilities;
(k)
A written statement to TVA certifying that the system shall be operated and maintained in such a way as to prevent any discharge or seepage of wastewater or sewage into the reservoir.