12.35—Specific inspection requirements.
(1)
Due consideration of all relevant reports on the safety of the development made by or written under the direction of Federal or state agencies, submitted under Commission regulations, or made by other consultants;
(2)
Physical field inspection of the project works and review and assessment of all relevant data concerning:
(ix)
Internal stress and hydrostatic pressures in project structures or their foundations or abutments;
(iv)
The relevant hydrological data accumulated since the project was constructed or last inspected under this subpart;
(v)
The history of the performance of the project works through analysis of data from monitoring instruments; and
(vi)
The quality and adequacy of maintenance, surveillance, and methods of project operations for the protection of public safety.
(b) Evaluation of spillway adequacy.
The adequacy of any spillway must be evaluated by considering hazard potential which would result from failure of the project works during flood flows.
(1)
If structural failure would present a hazard to human life or cause significant property damage, the independent consultant must evaluate the ability of project works to withstand the loading or overtopping which may occur from a flood up to the probable maximum flood or the capacity of spillways to prevent the reservoir from rising to an elevation that would endanger the project works.
(2)
If structural failure would not present a hazard to human life of cause significant property damage, spillway adequacy may be evaluated by means of a design flood of lesser magnitude than the probable maximum flood, if the report of the independent consultant pursuant to § 12.37 provides a detailed explanation of the bases for the finding that structural failure would not present a hazard to human life or cause significant property damage.