960.5-2-10—Hydrology.
(a) Qualifying condition.
The site shall be located such that the geohydrologic setting of the site will (1) be compatible with the activities required for repository construction, operation, and closure; (2) not compromise the intended functions of the shaft liners and seals; and (3) permit the requirements specified in § 960.5-1(a)(3) to be met.
(c) Potentially adverse condition.
Ground-water conditions that could require complex engineering measures that are beyond reasonably available technology for repository construction, operation, and closure.
(d) Disqualifying condition.
A site shall be disqualified if, based on expected ground-water conditions, it is likely that engineering measures that are beyond reasonably available technology will be required for exploratory-shaft construction or for repository construction, operation, or closure.