SUBPART E—Technical Criteria (§60.101 to §60.137)
- 60.101—Purpose and nature of findings.
- 60.102—Concepts.
- 60.111—Performance of the geologic repository operations area through permanent closure.
- 60.112—Overall system performance objective for the geologic repository after permanent closure.
- 60.113—Performance of particular barriers after permanent closure.
- 60.121—Requirements for ownership and control of interests in land.
- 60.122—Siting criteria.
- 60.130—General considerations.
- 60.131—General design criteria for the geologic repository operations area.
- 60.132—Additional design criteria for surface facilities in the geologic repository operations area.
- 60.133—Additional design criteria for the underground facility.
- 60.134—Design of seals for shafts and boreholes.
- 60.135—Criteria for the waste package and its components.
- 60.136—Preclosure controlled area.
- 60.137—General requirements for performance confirmation.